I-PRESSĀ® SUGGESTED MAINTENANCE SCHEDULE
ONLY PERFORMED BY AUTHORIZED MAINTENANCE TEAM LOCK OUT - TAG OUT
MONTHLY
1) Same as daily & weekly.
2) Confirm inside of MEP-Main Electrical Panel & MOS-Master Operation Station are clean and that no modifications have
been made and all wire-way din rail covers are in place.
3) Have a job stored in I-Press control for systems check, position, pressure and speed adjustment are working properly.
EVERY 6 MONTH
1) Same as daily, weekly and monthly inspection.
2) Check all fastening bolts to cylinder, slide guidance are secure.
3) Check all hoses pipes and manifolds are secure with no leaks present.
4) Document and save every inspection.
5) Contact sutherland presses for a complete preventative maintenance inspection.
EVERY 12 MONTH
1) Same as daily, weekly, monthly and every 6 months inspection.
2) With cylinders in the UP position for slide and DOWN position for cushion, drain oil tank.
3) Take 1 Quart oil sample and send out for oil analysis. Keep report in maintenance log book.
4) Open main oil tank, clean out covers, clean inside of tank before filling with new oil. Only use factory specified oil type.
5) Confirm main motor, coupling nd high-pressure pumps are secure and no leaks are present.
6) Clean press from top to bottom, inside and out.
IF YOU WOULD LIKE ANNUAL PREVENTATIVE
MAINTENANCE PROGRAMS CALL
SUTHERLAND 310-453-6981